Capital Improvements - Roads and Bridges En Español
PROJECT

DESCRIPTION

STATUS ESTIMATED COMPLETION DATE
Aldine Mail Route -
Airline to Aldine Westfield

Key Map 413E

Construction of a 4-lane
 concrete divided roadway,
with traffic signal upgrades. 

Design 2012
Beamer Road -
From Dixie Farm to F.M. 528

Key Map 616M

Provide a preferred route for schematic design of the Beamer Road extension from Dixie Farm Road to F.M. 528

Preliminary Engineering Undetermined
Beamer Road -
From Dixie Farm to West Bay Area Blvd.

Key Map 616M

Proposed 4-lane concrete divided roadway with traffic signal upgrades, storm sewer and drainage improvements.

Preliminary Engineering Undetermined
Blackhawk Boulevard at Beltway 8

Key Map 575Z

Left Turn Lane Design

Right Turn Lane Design

Design

Design
2010

2011
C.E. King Parkway at US 90A

Key Map 456M

Widen existing 2 lane asphalt
 roadway to a 4-lane
concrete roadway; completing boulevard section across railroad.

Construction 2011
C.E. King Parkway -
Tidwell to Beaumont Highway

Key Map 456C

Construction of a 4-lane concrete divided roadway with storm sewers, traffic signals and twin bridges.

Complete 2006
Constitution Lane
Pedestrian Bridge

Key Map 617X

Design /Construct a
Pedestrian Bridge

Design 2011
Cullen Boulevard -
From Almeda-Genoa Road to BW8

Key Map 573S

Design/Construct 4-lane divided concrete roadway.

Preliminary Engineering 2011
Dixie Farm Rd. -
Clear Creek to Beamer
 

Key Map 616Q

Joint participation with TXDOT and the City of Pearland for construction of a 4-lane concrete boulevard.

Complete

 

2008
East Mount Houston -
from BW8 to Mesa Road

Key Map 415K

Design a 4-Lane Concrete Roadway including Bike Paths

Preliminary Engineering

2011
East Mount Houston -
from BW8 to Mesa Road

Key Map 415K

Widen existing 2-lane asphalt roadway to 4 lane concrete roadway.

Preliminary Engineering 2011
El Dorado Blvd. -
Beamer Road to Blackhawk Blvd.

Key Map 617U

Proposed 4-land divided concrete roadway with storm sewer and traffic signal upgrades.

Complete

 

2010
Ella Blvd.(Wheatley) from Little York to West Gulf Bank

Key Map 412M

Design a 4-Lane Concrete
Roadway
with Storm Sewers.
(City of Houston managed project)

Design 2012
Gulf Bank at Sweetwater Lane

Key Map 412M

Provide drainage, left turn lane
 and traffic signal improvements.

Design 2011
       
Hughes Road
From Sageblossom to
Pearland City Limits

Key Map 616E

Design/Construct a 4-Lane divided concrete roadway, including bridges over HCFCD drainage ditch. 

Design
 
2011
Hutcheson Park Hike and Bike Trail
(IH 610 at Lockwood)

Key Map 454U

Provide fitness court, exercise equipment, sidewalks and improve drainage within park.

Design 2010
Imperial Valley
From Rankin to Harvest Time Lane

Key Map 372M

Design/Construct a 4-Lane
divided concrete roadway.

Construction 2011
Orem Drive - Phase IA Telephone to E. of Mykawa Rd.


Key Map 574R

Joint participation with the City of Pearland in the construction of a 4-lane concrete roadway and bridge with storm sewers and traffic signals.

Complete 2006

 

Scarsdale Blvd. -
Sageking to Yost Rd.



Key Map 616F

Joint participation with the City of Pearland in the construction of a 4-lane concrete roadway and bridge with storm sewers and traffic signals.

Complete 2007
Scott Street
From BW8 to Almeda -Genoa Road

Key Map 573Y

Design/Construct 4-lane
divided concrete roadway.

Preliminary
Engineering
 
2011
Scott Street
From Almeda -Genoa Road to Orem

Key Map 573L

Design/Construct 4-lane
roadway with storm sewers.

Design
 
2011
South Belt
Pedestrian Bridge


Key Map 616Q

Design / Construct
Pedestrian Bridge.

Design 2011
South Gessner
From BW8 to 0.45 miles along S. Gessner

Key Map 570 F

Re-construct existing 4-lane
concrete roadway with
new traffic signal.

Design
 
2011
Stafford/Staffordshire Road (Riceville School Road)
From BW8 to Fort Bend C/L)

Key Map 570E

Widen existing 2-lane asphalt roadway to a 4-lane
 concrete roadway.

Construction 2011